450' of McCain Walls Installed in 2 1/2 Nights

450' of McCain Walls at the San Diego International Airport
Project Details: Security Upgrades Throughout Terminal 2

The project was completed in 2.5 evenings with four journey men and two assistants.

The project was completed in 2 1/2 evenings with four journey men and two assistants. The reconfigurable custom McCain Walls system included:

  • 450' of McCain Walls
  • Three varying heights: 9', 11', and 14'
  • Five 90-degree corners
  • A set of double doors
End Results

The quick and easy installation of the McCain Walls system accelerated the startup project, allowing contractors to be engaged longer on the project. Its sleek appearance blends with the airport's aesthetics, blurring the lines of what is temporary and what is permanent. The high-quality finish exceeds the industry standards, enhancing travelers' experience and satisfaction, which is important to the airport.

Project Photos

Click the link to view other project photos.

For additional details and questions give us a call at 760.295.9230 or This email address is being protected from spambots. You need JavaScript enabled to view it..

McCain Walls Twitter

Get in Touch


    • Contact us

      Monday – Friday
      7AM – 3:30 PM (PST)

      760.295.9230

      Request Info
    • Location

      McCain Manufacturing
      2633 Progress Street
      Vista, CA 92081
      USA