760.295.9230
Email us

    Our Walls are taking the construction industry by storm!

    Find out what our customers are saying about McCain Walls reusable modular systems
    Los Angeles International Airport

    The switch to McCain Walls modular wall system at the LAX Terminal 2 renovation project vs. traditional GWB painted barricades proved to be an incredibly wise decision. The quality of McCain Walls is unmatched in terms of sustainability, requires little to no maintenance, is easily installed, relocated, and stored. The McCain Walls can be used over and over again, and pays for itself in no time at all. And it looks great!

    -Project Manager, Turner Construction


    Aria Resort & Casino

    I decided to give McCain Walls a try to provide my temporary construction wall at the Aria Hotel & Casino. It was competitively priced compared to the traditional metal framing & sheetrock construction wall method. The installation was superfast in a fraction of the time of traditional temporary wall barriers and is more durable, requiring less maintenance.

    There was no dust, no waiting for sheetrock mud or paint to dry. The product is fully finished upon delivery and customizable to meet my varying height ceiling. Upon completion, I received many compliments on the elegant look of the McCain Walls system and the client is completely satisfied. In addition, customer support was excellent with good communications throughout the buyout and installation phases. I recommend that your next temporary wall installation be a McCain Walls system.

    -Sr. Project Manager, MGM Resorts Intl


    Multiple Las Vegas Projects
    The McCain walls system was delivered on time, reduced our construction overall schedule, and installation was easy quick, and clean. Our owners and customers were very impressed and we have reused McCain walls several times already, making it very cost effective as well.

    -Supervisor, Buffalo Builders


    UC San Diego Healthcare System
    McCain Walls system was easy and fast to install…no hassles or complicated instructions. It’s a great alternative and clean, durable wall barrier system. We plan on using it for multiple projects throughout the hospital soon.

    -Project Manager, UC San Diego

    Get in Touch


      • Contact us

        Monday – Friday
        8AM – 4PM (PST)

        760.295.9230

        Request Info
      • Location

        McCain Manufacturing
        2633 Progress Street
        Vista, CA 92081
        USA