760.295.9230 | Email us

In the News with McCain Walls

Discover what we've been up to!



OSHA Enforces New Silica Rule

Rules and regulations are changing in the construction industry as we know it, all in the name of keeping employees healthy.

OSHA Silica New rule

Last year OSHA® (Occupational Safety and Health Administration) issued a ruling to protect workers from exposure to respirable crystalline silica and prevent new cases of silicosis. And as of September 23, 2017, they’ve begun enforcement with the Construction industry.

San Manuel Casino Double Stacks McCain Walls

San Manuel Casino Renovates Food Court Venues With McCain Walls

McCain Walls at San Manuel Casino
Project Details: New Food Court Venues

We are building walls faster than you can say CASINO! We installed a total of 1850sqft of McCain Walls from floor to ceiling wall in two separate locations in 2.5 days with only five workers at the San Manuel Casino located in Highland, CA.

McCain Walls at the Walls Ceiling Expo

McCain Walls Debuts in the Bay ARea

McCain Walls debuted its line of modular wall systems at the Walls, Ceiling, and Technology Construction Expo in Pleasanton, CA last week, and it was fantastic!

The Grove in Los Angeles

McCain Walls at The Grove in Los Angeles

Project Details: Outdoor Cantilever Bar

McCain Walls sleek, and modern look blends with the outdoor premier lifestyle center of The Grove in Los Angeles.

Subway at Monte Carlo Resort & Casino

McCain Walls Becomes Subway's Temporary Long-term Wall Solution

Project Details: New Subway Shop

McCain Walls have made drywall, plywood and other non-reusable materials used for temporary barricades a thing of the past.

Temp Walls Go Up at LAX Marriott

50' of McCain Walls Installed in 3 Hours!

Project Details: Starbucks Renovation Project in Hotel's Lobby

Our latest modular temporary wall system install happened earlier this month at the LAX Marriott. In only a few hours, 3 to be exact, two crew members installed 50’ of McCain Walls during normal business hours.

San Diego Intl Airport

450' of McCain Walls Installed in 2 1/2 Nights


Project Details: Security Upgrades Throughout Terminal 2

The project was completed in 2.5 evenings with four journey men and two assistants.

McCain Walls Twitter

Thinking about going modular? Let us eliminate the guesswork on your next project. Give us a call and we'll gladly give you an estimate. Contact Us

Get in Touch


    • Contact us

      Monday – Friday
      8AM – 4PM (PST)

      760.295.9230

      Request Info
    • Location

      McCain Manufacturing
      2633 Progress Street
      Vista, CA 92081
      USA
McCain Walls. When putting up walls is a good thing.
Copyright © 2017 McCain Manufacturing. All Rights Reserved. Privacy Policy